High-speed line Nuremberg–Erfurt–Leipzig/Halle, Germany
Part of the north/south corridor of the Trans-European Network (TEN 1) that runs from Scandinavia to Italy.
- Up to 300 km/h
- Longest tunnel: 8,314 m Bleßberg
- Initial use of ETCS Level 2
Scope of services:
- Project management, design, construction site management and construction supervision for various sections of the new and upgraded line, bridges and tunnels,
- design review and acceptance testing for control-command and signaling, overhead line equipment, electrical power systems.